SOLAS plants installed

PRODUCT CUSTOMER APPLICATION SITE ANALYSIS SAMPLING INSTALLATION
SOLAS 34 RWE Power AG
Hambach
Mine
Germany
Lignite Coal sampling from a stake box (rod box), steel construction over belt conveyor, additional sample preparation unit HAMILL 4000 + 250, NEW: automatic sample feeder ADOP , AIRMILL 6000, helium flushing, latest X-Ray analyzer X-PLORER 9000 2017
SOLAS 33 MIBRAG
Profen
Mine
Germany
Lignite Sampling from a conventional sampler, additional sampling unit with screw conveyor, AIRMILL 6000, helium flushing, latest X-Ray analyzer X-PLORER 9000 2016
SOLAS 32 Partner Company
Asia
Lignite Multiple sampling directly from 2 transfer points, AIRMILL 6000, helium flushing, latest X-Ray analyzer X-PLORER 9000 2016
SOLAS 31 RWE
Weisweiler
Power Plant
Germany
Lignite Multiple sampling directly from 2 transfer points, AIRMILL 6000, helium flushing, latest X-Ray analyzer X-PLORER 9000 2015
SOLAS 30 MIBRAG
Vereinigtes Schleenhain
Mine
Germany
Lignite Hammer-type sampler, steel construction over belt conveyor, additional sample preparation unit HAMILL 4000 + 250, NEW: sample bottler PAV, AIRMILL 6000, helium flushing, latest X-Ray analyzer X-PLORER 9000 2015
2014
SOLAS 29 Test Unit
USA
Lignite Multiple sampling directly from 2 transfer points, AIRMILL 6000, helium flushing, latest X-Ray analyzer X-PLORER 9000 2015
2014
SOLAS 28 Vattenfall Europe
Schwarze Pumpe
Power Plant
Germany
Lignite Multiple sampling directly from 4 transfer points, AIRMILL 6000, helium flushing 2012
SOLAS 27 RWE
BoA Neurath Power Plant
Germany
Lignite Additional sample preparation unit, helium flushing 2012
SOLAS 26 RWE
BoA Neurath Power Plant
Germany
Lignite Additional sample preparation unit, helium flushing 2012
SOLAS 25 VALE
Iron Ore Mine
Brasil
Iron ore Sampling from a conventional sampler, Drying system, AIRMILL 6000, helium flushing => INSTALLATION scheduled 2014 2014
SOLAS 24 Vattenfall Europe
Boxberg Power Plant
Germany
Lignite Multiple sampling directly from 2 transfer points, AIRMILL 6000, helium flushing 2010
SOLAS 23 Vattenfall Europe
Boxberg Power Plant
Germany
Lignite Multiple sampling directly from 2 transfer points, AIRMILL 6000, helium flushing 2010
SOLAS 22 RWE
Niederaussem Power Plant
Germany
Lignite Additional sample preparation unit, AIRMILL 6000 with frequency control, helium flushing 2010
SOLAS 21 RWE
Niederaussem Power Plant
Germany
Lignite Additional sample preparation unit, AIRMILL 6000 with frequency control, helium flushing 2010
SOLAS 20 Vattenfall Europe
Jänschwalde Power Plant
Germany
Lignite Multiple sampling directly from 2 transfer points, AIRMILL 6000, helium flushing 2010
SOLAS 19 Vattenfall Europe
Jänschwalde Power Plant
Germany
Lignite Multiple sampling directly from 2 transfer points, AIRMILL 6000, helium flushing 2009
SOLAS 18 Vattenfall Europe
Jänschwalde Power Plant
Germany
Lignite Multiple sampling directly from 2 transfer points, AIRMILL 6000, helium flushing 2009
SOLAS 17 RWE
Garzweiler Mine
Germany
Lignite Additional sample preparation unit, helium flushing 2008
SOLAS 16 RWE
Garzweiler Mine
Germany
Lignite Additional sample preparation unit, helium flushing, automatic sample feeder ADOP 2007
2012
SOLAS 15 Severočeské Doly
Doly Bilina
Czech Republic
Lignite Multiple sampling directly from 4 transfer points, AIRMILL 6000, helium flushing 2008
SOLAS 14 Severočeské Doly
Tusimice
Czech Republic
Lignite Multiple sampling directly from a transfer point and from existing conventional sampler, AIRMILL 6000, helium flushing 2008
SOLAS 14 VALE
Iron Ore Mine
Brasil
Iron ore SOLAS Test-installation. VALE ordered a new SOLAS system for the final installation place 2006
SOLAS 13 Vattenfall Europe
Lippendorf Power Plant
Germany
Lignite Multiple sampling directly from 4 transfer points and from existing conventional sampler, AIRMILL 6000, helium flushing 2005
SOLAS 12 / KOLA 2 RWE
Hambach Mine
Germany
Lignite Additional sample preparation unit 2003
SOLAS 11 / KOLA 1 RWE
Hambach Mine
Germany
Lignite Additional sample preparation unit 2002
SOLAS 10 RWE
Neurath Power Plant
Germany
Lignite Direct sampling after crusher, updated in 2005 with AIRMILL 6000 and helium flushing 2001
2005
SOLAS 9 RWE
Neurath Power Plant
Germany
Lignite Direct sampling after crusher, updated in 2005 with AIRMILL 6000 and helium flushing 2001
2005
SOLAS 8 Severočeské Doly
Doly Bilina
Germany
Lignite Direct sampling from transfer point, additional mill 2000
SOLAS 7 Deutsche Steinkohle AG
Ensdorf Mine
Germany
Coal Direct sampling from transfer point, additional Sample Dryer Modul 2000
SOLAS 6 RWE
Garzweiler Mine
Germany
Lignite Direct sampling from transfer point 1999
SOLAS 5 Severočeské Doly
Doly Nastup Tusimice
Czech Republic
Lignite Sampling from Sizer, additional hammer mill 1999
SOLAS 4 Severočeské Doly
Doly Nastup Tusimice
Czech Republic
Lignite Direct sampling from transfer point 1998
SOLAS 3 RWE
Garzweiler Mine
Germany
Lignite Direct sampling from transfer point 1997
SOLAS 2 Severočeské Doly
Doly Bilina
Czech Republic
Lignite Direct sampling from transfer point 1995
SOLAS 1 RWE
Fortuna Bergheim Mine
Germany
Lignite Direct sampling from transfer point 1995